Under Offer

Springfield Rise, Treharris, CF46 5RD

Bed icon  5    Bath icon  3    receptions icon  2

Offers in Excess of, £450,000

Save Saved
Contact Us

For further details on this property please call us

01443 218439


Book a Viewing

Features

  • Self build family home with high spec finishes throughout
  • Five good size bedrooms, master has en-suite
  • Corner plot with far reaching mountain views all around
  • Ideal for commuting via the A465
  • Block paved driveway
  • Backing onto open fields
  • Balcony to the first floor
  • Large entertainment room
  • Media wall in Main lounge

Full Details

Walker and Lewis are pleased to offer for sale a unique self build detached family home which is positioned on a good size plot at the corner of a quiet cul de sac where the views are just breath-taking, from all aspects of the property. This four/five bedroom executive home from entering the hallway you can see the the quality of finish throughout plus having upside down living which gives you plenty of family living. The bright and airy entertainment room is an ideal for family get togethers, and the large lounge on the first floor gives you access to the balcony where you can sit and enjoy the beautiful Welsh mountains and relax on a summer evening. The master bedroom has an ensuite and there are two other separate bathrooms, plus a ground floor utility room, and a good size garage, plus plenty of off road parking. Call to view to appreciate what this property has to offer. Hallway double sold wooden doors to hallway, tiled flooring, access to study/bedroom 5, entertainment room and bedroom 4 and bathroom and utility room, with access to a large walk in storage cupboard, access to first floor Entertainment room 7.43 m x 4.75 m (24'5" x 15'7") Window to front, French doors to side, plus a bay window to the front, currently has a full size snooker table with spotlight Bedroom 4 3.34 m x 5.07 m (10'11" x 16'8") French door to side, window to rear Bedroom 5/Study 4.16 m x 2.67 m (13'8" x 8'9") Window to front Utility Room Wall and base units, worktops, sink, door to rear , tiled flooring Bathroom Jacuzzi bath, double shower cubicle, vanity sink, low level wc , all tiled walls and flooring, window to rear First floor landing Access to bedrooms, bathroom and lounge and kitchen/dining room, window to front Lounge 7.64 m x 4.75 m (25'1" x 15'7") Window to side and two windows to front, feature media cinema wall and feature fire, spotlights, door access to balcony Kitchen/dining room 3.35 m x 6.30 m (11'0" x 20'8") Window to rear and side, wall and base units, granite worktops, built in 5 burner hob and oven, splash back tiles Master bedroom 3.84 m x 5.67 m (12'7" x 18'7") Window to front, French doors to leading to balcony, access to en-suite, fitted wardrobes En-suite Window to side, double shower cubicle, wash hand basin, low level wc, all tiled walls and flooring Bedroom 3 4.00 m x 3.49 m (13'1" x 11'5") Window to rear Bedroom 2 2.95 m x 2.41 m (9'8" x 7'11") Window to rear Bathroom Bath with shower over, low level wc, vanity sink, window to rear, all tiled walls and flooring Balcony Access via the main bedroom and lounge , with far reaching views Garage Electric newly fitted up and over doors, with a large storage area, with power and lights Front garden and driveway Block paved driveway leading to garage, access to front garden laid with with artificial grass and decking area to appreciate the views , with side garden laid with patio Rear garden Laid with patio area and steps up to garden laid with lawn and backing onto open fields
Floorplan for Springfield Rise, Treharris, CF46 5RD
EPC Graph for Springfield Rise, Treharris, CF46 5RD

Book a Viewing

1About You


@

2Pick a Day


  1. This Week
  2. Next Week
  3. In a Fortnight

3Select a Time



About Us

Walker & Lewis Estate Agents are an independent firm of estate agents based in the Pontypridd.

Read More
About Us

Property for sale

View All Properties
Sales

Register

Register for Property Updates

Register Here
Register

Valuation

How much is your property worth? Stop wondering and find out, with a property valuation from Walker & Lewis.

Book Here
Valuation